Land rights management, keeping your scheme on track.

An adopted network needs a document behind every asset. It could be a substation agreement, a deed of easement, a wayleave or another instrument, and each one is a separate instruction with its own parties, its own plan and its own risks. Completing all of them on time is what keeps a scheme on track.

Land Rights Management is the managed service Macvere Land Rights provides on behalf of IDNOs. We manage your land rights process, so the operator has one accountable party from instruction to completion: we prepare the plan, instruct and coordinate the solicitors, manage the negotiation on your behalf and track every requirement to completion in the Insight portal.

What we manage

Substation agreements

IDNO and DNO substation leases and freehold transfers, with the access, cable and ancillary rights the network operator requires. We agree the site with the design, draw the Land Registry compliant plan and keep the agreement moving through the developer's and the operator's solicitors.

Deeds of easement

Permanent rights for cables crossing land the developer does not control, drawn to Land Registry standards and negotiated to completion so the adopted network has the rights it needs behind every asset.

Incorporated rights agreements

Where the DNO or IDNO uses a combined, incorporated rights agreement for the substation, we prepare the plan and manage it as a single instruction. One document, one negotiation, one completion.

Wayleaves

IDNO and DNO wayleaves where a permanent easement is not available. We advise when a wayleave is the right instrument and when it is a risk the scheme should not carry.

Deeds of variation and other instruments

Designs change. Where an agreement already in place no longer matches the network, we prepare the plan and manage the variation rather than starting the transaction again. Any other instrument the scheme needs is managed the same way, as part of the instruction.

How an instruction runs

We take a proactive approach. We engage ahead of design approval wherever we can, settle the consenting position early, and chase every open action rather than wait for it. That approach has a proven record of reducing the timescales of land rights transactions.

  • We confirm the host network's requirements and yours, including the TOI and LIF on electricity schemes.
  • We prepare the Land Registry compliant legal plan. The first plan is part of the instruction, and minor cable route amendments are absorbed.
  • We instruct your solicitor where required, confirm with them exactly what is needed to complete, and share that list with you.
  • Every party you choose sees the live position in the Insight portal. When an action sits with a landowner or an end client, the portal prompts them and follows up.
  • Where an energisation date is set, we give our view a month ahead of it on whether land rights will be in place in time.

Fixed scope, named contact

Connection businesses need consents handled the same way every time. We work to fixed fees per instruction wherever possible, additional titles and parties are scoped separately, and every instruction has a named contact at Macvere for its life. Where a date is at risk, we say so early.

FAQs

What is the difference between a substation lease and a transfer?

A lease grants the network operator a long-term right to occupy the substation site, with the landowner keeping the freehold. A transfer passes the freehold of the site to the operator. Both contain the rights the network operator needs to access and maintain its equipment. Which one is used depends on the operator's adoption requirements and the developer's preference, and we advise on both.

Do you cover DNO schemes as well as IDNO schemes?

Yes. We prepare plans and manage consents to DNO requirements as well as IDNO requirements.

Macvere Land Rights

Talk to Land Rights

Tell us about the connection scheme, the substation or the easement. We will tell you quickly what it will take.