Land Rights Review: know the risks before they cost you time.
Apparatus on your land is only half the question. The other half is who holds rights over the land, what those rights allow and what they could block. The answers decide whether your energisation date holds.
Our Land Rights Review is for developers and landowners. We review land ownership, highway adoption, existing rights over the land, and the easements and wayleaves held over any nearby services, and we advise on the risks to your land rights transaction and the action you can take early to avoid later delays to your energisation timeline.
What you receive
A written report
Conclusion first. The risks to your land rights transaction, ranked, with what each one means for the programme and what to do about it.
An interactive constraints plan
The findings are presented in a written and interactive format. The report comes with an interactive constraints plan, so the position on the ground can be read at a glance alongside the findings.
Analysis of existing rights
The core of the review is the existing legal rights over the land, whether they are contained in the title documents or held by existing service providers. We tell you who holds each right and what you can do to address or mitigate it when it comes to the installation of utility apparatus.
Wayleave terminations
Where apparatus is held on a terminable wayleave, it can sometimes be terminated. Termination has legal and cost implications, and we advise on both and help you through the process where it is the right course.
The earlier, the cheaper
The right time for a review is before the masterplan is fixed and before your land rights transaction starts. A risk found then is designed around or addressed in parallel with the design. The same risk found after design approval waits on the programme's critical path.
Connection ReadyFAQs
What is the difference between an easement and a wayleave?
An easement is a permanent right registered against the land and binding on successors. A wayleave is a contractual agreement, usually annual and terminable on notice. Which one applies determines whether apparatus can be required to move - and who pays.
Can I make a utility company move its apparatus?
Sometimes. It depends on the right they hold, the notice provisions and the statutory protections that apply. Where a wayleave is terminable, serving notice can shift the cost of removal or diversion. Every case needs the documents read first.
Should rights be checked before buying land?
Yes, and before the masterplan is drawn. An easement can sterilise part of a site even where no apparatus is visible. Where the question is the wider utility position of a site, that sits with Macvere Utility Consultants' due diligence service.
Related services
More from Macvere Land Rights
Macvere Land Rights
Electric legal plans
HMLR compliant legal plans for substations, cable easements and adopted networks, verified against IDNO and DNO requirements.
Read moreMacvere Land Rights
Connection Ready
For developers and landowners who want to get ahead of land rights: early design review, a requirements report for your solicitor and live progress in the Insight portal.
Read moreMacvere Land Rights
Land Rights Management
Substation agreements, deeds of easement, wayleaves and every other instrument an adopted network needs, managed on behalf of IDNOs to completion, keeping your scheme on track.
Read moreMacvere Land Rights
Land rights glossary
Easement, wayleave, TOI, LIF, IDNO, ICP, HMLR plan and the rest of the vocabulary, defined in plain English.
Read moreMacvere Land Rights
Talk to Land Rights
Tell us about the connection scheme, the substation or the easement. We will tell you quickly what it will take.